Rocky River High School gym floor resurfacing

Lots of floor preparation was needed before Nu Floor Systems was able to install a new floor for the Rocky River High school gym
Lots of floor preparation was needed before Nu Floor Systems was able to install a new floor for the Rocky River High school gym
We minimize our impact on the interior of the structures we work in as much as possible
We minimize our impact on the interior of the structures we work in as much as possible
Beginning the layering of the new floor application
Beginning the layering of the new floor application
Flooring installation completed in sections
Flooring installation completed in sections
New gym floor nearing completion!
New gym floor nearing completion!

Historical Onesto Building Revitalization Project in Canton, Ohio

This commercial floor reconstruction project had it's challenges.  Beginning with the fact that the floor replacement was 12 stories above the ground in a high rise building!  Our expert flooring crews pumped the floor leveling materials from the ground level garage up to the 12th floor of the building!

Over 50,000 square feet of 1" USG Levelrock product pumped within 3 days
Over 50,000 square feet of 1" USG Levelrock product pumped within 3 days
Grout pump staging area
Grout pump staging area
50,000 sq. ft. of cement pumped in 3 days!
50,000 sq. ft. pumped in 3 days!
Grout pump staging area
Grout pump staging area
Nu Floor crew carefully applying the self leveling floor compound
Nu Floor crew carefully applying the self leveling floor compound
Level floor installed and drying

MT Silver Building Cleveland, Ohio 20,000 sq. ft.

Existing floors were badly deformed and deteriorating.  Nu Floor Systems pre leveled the floor with as much as 5" of a proprietary  lightweight fill to keep the weight down.  The leveling of the floor was achieved by 1.5" of USG LevelRock underlayment.

commercial floor hole repair
Large sections of floor needed replaced
Commercial Floor renovation and repair
Floor removed down to the joists
Commercial flooring sleeper repair
Removal of deteriorated sleepers
commercial flooring replacement
Existing hardwood floor removed to expose deteriorating sleepers
Floor replacement with self leveling cement
Sub-Floor prior to cementitious toppings
1/2" USG Ultra Armor finish flooring
USG Ultra Armor Finish Installation
Application of the self-leveling compound
Application of the self-leveling compound
Refurbished factory flooring
Finished self leveling floor installation
Commercial Building floor repair
Finished flooring project nearly complete